| constructor Calendar::Calendar (Previous) | (Next) Calendar::build | ||||
| |
|||||
|
|||||
Helper method. You can adjust calling object's date just like mktime does. For instance, (2003, 11, -1) will be translated to (2003, 10, 31). This method allows math operations on dates.
| constructor Calendar::Calendar (Previous) | (Next) Calendar::build | ||||||||
| |
|||||||||
|
|||||||||